[fluka-discuss]: ตอบกลับ: Question about LET scoring with USRBIN

From: Warisara Charuchinda <6270101123_at_student.chula.ac.th>
Date: Wed, 18 Oct 2023 12:07:52 +0000

Dear Paolo,

Thank you so much for the answer. We had a misunderstanding about the size of annular beam. We did recalculation and now the numbers from FLUKA and SRIM are similar.

Thank you again,
C.Warisara
________________________________
จาก: Warisara Charuchinda
ส่ง: 17 ตุลาคม 2566 20:46
ถึง: fluka-discuss_at_fluka.org <fluka-discuss_at_fluka.org>
สำเนาถึง: R.Mishima_at_gsi.de <R.Mishima_at_gsi.de>
ชื่อเรื่อง: Question about LET scoring with USRBIN


Dear FLUKA experts,


I am a beginner of FLUKA.

I am trying to calculate the stopping power of a 290 MeV/n 12C incident on a CR-39 detector (plastic detector).
The geometry is a simple system with a rectangular target (6 * 6 * 40 cm^3, CR-39) in vacuum.
I have calculated the energy deposition (GeV/cm^3 per primary) using USRBIN.
I multiplied the result by the area (36 cm^2) of the plane perpendicular to the irradiation direction (i.e., the XY plane) and converted the units to GeV/cm per primary.

I also multiplied this by 100 to change the units to keV/um per primary.
The FLUKA results were compared with the SRIM code. FLUKA results were about three times smaller than SRIM results.

(For example, at the target entrance, FLUKA and SRIM were predicted to be 5 keV/um and 15 keV/um, respectively.)


Is there a problem with the conversion method? Thank you so much in advance for your answer.


Best regards,

C.Warisara



__________________________________________________________________________
You can manage unsubscription from this mailing list at https://www.fluka.org/fluka.php?id=acc_info